Our projects
Key projects of MESA Engineering.
From Murmansk Region to Primorye
- 13
- projects
- 10
- regions of Russia
- 6 440
- km to the furthest site
Eight key projects by industry (2026 portfolio).
Arctic LNG 2 — GBS
We installed the membrane system at the Arctic LNG 2 site — in the LNG tanks of the gravity-based structures (GBS).
Tank data from open sources (GTT, 2019). GTT's membrane technology for GBS tanks (GST®) is based on Mark III.
Photographs
Zvezda Shipbuilding Complex
Works on the membrane cargo containment system of two Arc7 ice-class LNG carriers of the Arctic LNG 2 series, at the cargo tank installation stage.
Vessel data from open sources.
Photographs
Arctic LNG 2 — AWP / GWP modules
Photographs
Amur Gas Processing Plant
Photographs
Udokan Mining & Metallurgical Plant
Photographs
ZapSib-2 ethylene cracker
Photographs
Volgafert Azot
Photographs
Linde Azot ammonia/hydrogen unit
Photographs
Five more projects
Let's discuss your project
Send us the bill of quantities, technical specification or drawings and we will prepare a proposal for insulation, membrane works or coatings.