01
Incoming inspection and degreasing
We inspect the steel: rust, mill scale, welds and sharp edges. We remove oil and contaminants — before abrasive blasting.
WhyOil is not removed by the abrasive — it is smeared over the surface, and the coating will peel at that spot.
ChecksInitial surface condition (ISO 8501-1), preparation of edges and welds, and the absence of oil contamination.
02
Abrasive blast cleaning
We blast the surface to grade Sa 2½ according to GOST R ISO 8501-1 (ISO 8501-1), and to Sa 3 where required.
WhyThe abrasive removes rust and mill scale and creates roughness — a profile that the primer can key into.
ChecksThe cleanliness grade is judged against ISO 8501-1 standards, and the treatment must be even over the whole surface.
03
Pre-paint checks
We check roughness, dust removal and the climate: surface temperature, air humidity and the dew point.
WhyDust and unseen condensation under the primer are common causes of peeling. We paint only a clean, dry surface.
ChecksRoughness profile, dust (tape test), surface temperature at least 3 °C above the dew point, and humidity as in the manufacturer’s data sheet.
04
Primer
We apply the primer of the selected system: first a stripe coat on edges, welds and awkward areas, then the whole surface.
WhyThe primer is responsible for adhesion and protection of the steel. On edges and welds the coating comes out thinner — so we paint them separately.
ChecksApplication conditions and recoat intervals follow the manufacturer’s data sheet, as do wet- and dry-film thickness.
05
Intermediate coat
After the recoat interval we apply the intermediate coat to the clean primer surface.
WhyThe intermediate coat builds the system thickness — it is the main barrier against moisture and an aggressive environment.
ChecksThe recoat interval, cleanliness between coats and coat thickness — as designed.
06
Finish coat
We apply the finish coat: it protects the system from UV and the weather and sets the colour.
WhyThe finish takes the sun, rain and mechanical wear; colour and gloss follow the design.
ChecksContinuity and appearance: no misses, runs or inclusions.
If the design calls for fire protection of the steelwork, we apply a thin-film intumescent coating over a compatible primer to the design thickness.
07
Thickness and adhesion
We measure the dry-film thickness (DFT) of each coat and of the whole system, and we check adhesion.
WhyThe service life of the system under ISO 12944 is calculated for the design thickness: a thin spot is a future corrosion site, and excess thickness risks cracking.
ChecksThickness follows the design and the manufacturer’s data sheet; adhesion is checked by the method given in the design. Defects are repaired and checked again.
08
Acceptance and documentation
We hand over the coating together with the as-built documentation.
WhyThe coats under the finish are no longer visible — the documents confirm that the preparation and each coat were completed as designed.
Checks and documents
- Concealed-works certificates: surface preparation and each coat
- Work log: application conditions, materials, batch numbers
- Thickness and adhesion test reports