Piping, fittings, valves and vessels — from surface acceptance to as-built documentation. Scroll: the diagram assembles step by step, and for each step you see what we do, why, and what we check.
Thermal insulationCold insulationCorrosion protection under insulationRemovable covers and mattressesShaped fittings — our own workshop
Pipe cross-section · schematic
01/ 07 Preparation
Hot service: without insulation — heat loss and a burn hazard
Cold service: without insulation — condensation and icing
Section · layer
Pipe steel
Primer / AKZ
Insulation — mineral woolInsulation — PIR / rubber / foam glass
Second layer with staggered joints
Vapour barrier — where specifiedVapour barrier — the key layer
Metal cladding
Schematic diagram
01
Preparation and acceptance for insulation
We accept the work front: welding and testing of the pipeline are complete, the surface is clean and dry, supports and attachments are in place.
WhyOnce insulated, the metal is closed in for years — a defect can later be fixed only by opening the system up.
ChecksSurface inspection and a readiness certificate (handover of the work front) for insulation.
02
Anticorrosive protection
We apply the primer or anticorrosive system specified by the design to the prepared surface.
WhyIf moisture gets under the insulation, the metal starts to rust unseen — this is corrosion under insulation (CUI). The coating is the first barrier.
ChecksSurface preparation grade, dry film thickness and adhesion; the coating system follows the design and ISO 12944 / GOST.
03
Thermal insulation layer
We install mineral-wool cylinders or mats. Where there are two or more layers, we stagger the joints of the next layer relative to the previous one. We fix them with bands.We install products for cold service — PIR, foam glass or elastomeric foam. We lay them in several layers with staggered joints and seal the seams.
WhyThickness and a tight fit determine heat loss and surface temperature; staggered joints leave no through-going thermal bridges.
ChecksMaterial and thickness follow the design and SP 61.13330 “Thermal insulation of equipment and pipelines”; a tight fit with no gaps.
04
Vapour barrier
Thermal insulation usually does not need a vapour barrier — we install one only if the design requires it.We lay a continuous vapour-barrier layer with overlaps and seal the joints, ends and interfaces with supports and valves.
WhyOn cold piping this is the key layer: moisture from the air condenses on the cold surface and freezes.Moisture from the air is drawn to the cold surface: without a sealed vapour barrier it condenses and freezes in the insulation, the insulation loses its properties, and the metal corrodes.
ChecksContinuity of the layer, overlaps and sealing of joints and ends are recorded in the concealed-works certificate.
Switch the diagram to to see the difference.
05
Cladding and shaped fittings
We install metal cladding — galvanized steel, aluminium or stainless steel. Overlaps follow the direction of water run-off; fastening is with screws and bands.We install metal cladding — galvanized steel, aluminium or stainless steel. Overlaps follow the direction of water run-off; on cold insulation we fix it with bands, without puncturing the vapour barrier.
WhyThe cladding protects the insulation from weather, UV and mechanical damage; correct overlaps keep water out from under the cladding.
ChecksDirection of overlaps, fastener spacing, and sealing of joints and penetrations.
Elbows, tees, reducers and other shaped fittings are made in MESA’s own workshop in Moscow.
06
Equipment and valves
Vessels and equipment are insulated with mats shaped to the surface and closed with cladding. Gate valves, valves and flanges get removable covers or mattresses, made to site measurements.
WhyValves and flanges need maintenance: removable insulation is taken off and put back without damage — nothing has to be cut and repaired.
ChecksAccess to service points and flange bolts, a tight fit, and reliable fasteners.
07
Acceptance and as-built documentation
We hand over the work: we check thickness and fit and pass on the as-built documentation.
WhyThe layers under the cladding are no longer visible — the documents confirm that they were completed as designed.