01
Marking and embedded fittings
We accept the inner hull of the tank, carry out the marking and install the anchors and embedded fittings that the whole system rests on.
WhyThe membrane system is fixed directly to the hull: the position of every panel and every membrane weld depends on the accuracy of the marking.
ChecksCondition and cleanliness of the hull surface, accuracy of the marking, and the position of embedded fittings — as designed.
02
Resin ropes (mastic)
We apply resin ropes (mastic) in rows along the marking — the insulation panels sit on them.
WhyThe hull is never perfectly flat: the ropes take up irregularities and transfer the load from the panels to the hull evenly.
ChecksPosition and spacing of the ropes, pot life of the mastic, and temperature and humidity in the tank.
03
R-PUF insulation panels
We install and level panels of reinforced polyurethane foam (R-PUF) with plywood facing.
WhyThe panels are the main thermal insulation layer: they keep the −163 °C cold inside and transfer the cargo pressure to the hull.
ChecksLevelling the panels into a common plane, the gaps between panels, and fixing to the embedded fittings.
04
Triplex secondary barrier
We fill the joints and bond the Triplex secondary barrier — a composite of aluminium foil and glass cloth — overlapping the panel joints.
WhyThe secondary barrier is the second line of tightness: if the membrane is damaged, it holds the LNG and protects the hull from the cold.
ChecksSurface preparation for bonding, application without bubbles or wrinkles, and a tightness test of the secondary barrier.
05
Top insulation layer
We close the joints of the top layer with insulation inserts and level the surface for the membrane.
WhyThe membrane needs a continuous, even base: there must be no steps or voids left underneath it.
ChecksContinuity of the insulation at the joints and flatness of the base for the membrane.
06
Primary 304L membrane
We install corrugated 304L stainless-steel sheets 1.2 mm thick and weld them: automatic and semi-automatic TIG welding, with manual welding at nodes and corners.
WhyThe membrane is in direct contact with the LNG. The corrugations act as compensators: as the metal cools and contracts, the corrugations take up the deformation.
ChecksAppearance and continuity of the welds, and alignment of the corrugations at the sheet joints.
07
Tightness tests
We check the tightness of the membrane and the welds with a vacuum box and with ammonia and helium tests.
WhyOnce the tank is closed and cooled down, finding and fixing a leak is far harder. Every remark is corrected and checked again.
ChecksMethods and criteria follow the project test programme; results are recorded in the reports.
08
As-built documentation
We hand over the works and pass on the as-built documentation for each stage.
WhyThe layers under the membrane are no longer visible — the documents confirm that each one was completed and checked.
Checks and documents
- Work logs
- Test reports
- As-built drawings