Services / HVAC: heating, ventilation and air conditioning
How we work · 7 steps
HVACstep by step
Ventilation, chilled- and heating-water systems, and heat substations — from route marking to commissioning and as-built documentation. Scroll: the plant room assembles step by step, and for each step you see what we do, why, and what we check.
VentilationChiller–fan-coilHeating and heat substationsChilled-water supplyCommissioningDuctwork — our own workshop
AHU room and space · schematic
01/ 07 Marking
Diagram · stage
Marking and hangers
Ductwork
Heating- and chilled-water piping
AHU, dry cooler, heat substation
Insulation and labelling
Schematic diagram
01
Marking and hangers
We study the design and the site, mark the duct and pipe routes, and install rods, beams and brackets.
WhyThe hangers carry the systems for decades, and accurate marking avoids clashes with adjacent trades — plumbing, finishes and the façade — in advance.
ChecksRoute axes and levels as designed, hanger spacing and reliability, and coordination with adjacent trades.
02
Ductwork installation
We install rectangular, round and spiral ducts, silencers, control and non-return dampers, and air terminals.
WhyA route without unnecessary bends and restrictions means the design air volume, less noise and less load on the fan.
ChecksTightness of joints, fixing, and access to dampers; installation in work packages, at the pace of the building works.
Ducts and fittings are made in MESA’s own workshop in Moscow.
03
Heating- and chilled-water piping
We install heating- and chilled-water piping, isolation valves and balancing valves.
WhyHeat and cooling reach the equipment through the pipes: whether the system meets the design parameters depends on the quality of the connections.
ChecksRouting and supports as designed, valves in their places; hydraulic tests — before the insulation is closed up.
04
Equipment
We install air-handling units (including units with heat recovery), chillers and dry coolers, and heat substations — plate heat exchangers and pump groups. We make the connections and join the ducts through flexible connectors.
WhyCorrect connections and flexible connectors keep vibration off the networks and leave access for maintenance.
ChecksIncoming inspection of equipment, installation level on a prepared base, and service clearances.
05
Insulation of ducts and piping
We insulate ducts and piping; cold piping gets thermal insulation with a vapour barrier. In plant rooms we close the insulation with metal cladding and label the pipes.
WhyInsulation keeps heat and cold in, and the vapour barrier stops condensation on cold pipes and ducts.
ChecksContinuity of the insulation and vapour barrier, sealing of joints, and labelling by service and flow direction.
06
Testing and commissioning
We pressure-test and flush the piping, carry out individual equipment tests, airflow tests and balancing, and adjust air and water flow rates.
WhyAn installed system is not yet a working one: commissioning brings every room to the design flow rates and temperatures.
ChecksMeasurements of flow rates, temperature and noise, and integrated system trials.
07
As-built documentation and handover
We keep the documentation in parallel with the installation and hand the systems over to the client and the operator.
WhyHandover of the trade does not delay the start-up of the facility, and operations receive a complete package for each system.
Checks and documents
Concealed-works certificates
As-built drawings
Ventilation system passports
Test and commissioning certificates